Past Projects

List of finished projects

2008-2009 Projects:

Symantec endpoint version update (Sharepoint, campus, halls) - Complete 6/15/09 
 
New file system spec and on order - 6/10/2009.
 
BossCars in production - Complete 6/8/2009
 
ODS 8.1 in production - Complete 8/8/2009
 
Filesystem to VM:
Q - 4/15/2009
N - 5/16/2009
W - 4/12/2009
U - 4/10/2009
P -5/16/2009
 
Google Model email - Project Cancelled.
 
Resnet Enpoint. - complete 8/15/2009.
 
Faculty/Staff TSM Server move. Complete - 2/13/2009.
 
New VM hardware - VS8, VS9 - Installed 4/15/2009.
 

WinRas to Hulk server move. Complete - 3/12/2009.

New Edtech - OS/BIOS/FW - complete 7/10/2009.

Ekey Reset Manager update - 4/20/2009.

New Cbord servers - complete 4/30/2009.

Blackboard Oracle 10g upgrade - complete 5/12/2009.

Blackboard test 9.0 - Complete 5/1/2009

Blackboard production 9.0 Aug. 11-14 - complete 8/12/2009.

Create Blackboard 8.0 Test system - Finished 1/21/2009 - Complete.

Student backup data move to SAN's - Complete - 1/15/2009
 
Faculty/Staff backup data move to SAN's - Complete - 2/10/2009
 
Purchase additional Mac server and place the Apple directory service on it. Upgrade Big Mac to the latest OS. 9/23/2008. Server arrived 10/22/2008. Complete 4/09/2009
 
EOL Servers:
Tom's hardware
Hardware disposal - complete -8/15/2009.
 
 

2007-2008 Projects:

 

Blackboard Upgrade  -  Dec. 2007 - Complete

Faculty and Staff Exchange 2007 update http://itds.eku.edu/email/exchange2007.php - Dec. 2007 - Complete

 
Anti-Spam System Software Update to 4.x - 2/15/2008 - Complete
 
Eprint Software Upgrade Jan. 18th 2008. - Complete
 
Oracle 10g to be placed into the production Banner system - Feb 16th 2008. - Complete
 
Student Exchange 2007 update - Target Date - Spring break 2008 (March 10 thru 14 2008). - Complete

Aviation Testing Program available under Blackboard - 3/8/2008 - Complete

OWA Read-Only Direct file access - U and W

Documentation complete, broader IT testing in process. - in production - 5/5/2008 Complete
OWA Read-Only Direct file access - W for students. 7/5/2008 Complete.
 

Anti-Spam email streams that have not been set by the user have been changed to "average". This will decrease the amount of spam received by our users. 6-2-2008. - Complete.

Sharepoint 2008
Production system date - TBA.
New server and storage complete and ordered.
System arrived and racked.
Installation complete.
Testing in progress.
In production - 12/2008 - Complete.
 
Pharos printing replacement servers purchased. Server replacement switch - May 13th-15th 2008. - Complete.
 
Anti-Spam Server Replacements - Underway.
One server setup and ready to cut-in to production - 2/12/2008.
Second server arrived, awaiting install. - 6/19/2008 - Complete
 
Oracle Warehouse Builder - TBA
Training scheduled March 24th and April 14th 2008 - Complete
 
Alumni system into test and production - Oct. 2008. - Complete.
 
Luminus Web Portal - TBA
System Admin Classes Scheduled - Done by May 9th 2008. - Complete

Test Luminus VM Servers to be created by June 27th. - Complete

 
Blackboard 8.0 Upgrade
Creating development system for 8.0 testing - 3/25/2008 - Complete.
Will create full testing environment for install testing.
Full test environment by 4/28/2008 - Complete.
Test 8.0 system install - 4th install test to start.
Into production on 8/15/2008 - Upgrade to start on 8/9 - 8/14 2008 - Complete
 
Plone testing for controlled video distribution using Apple server and Apple based storage.
This will be used by the Center on Defness and Hearing Loss. - TBD
 
Trac-Dat System software update to 4.0.6.5 - 5/30/2008 - Complete.
 
Schedule/Resource 25 - Now Series 25
Setup required servers and required system software.
Systems test and production servers and DB install scheduled for April 28 - May 2nd. - Complete.

Production system DB install - Complete

Additional Memory and storage to be added to the Banner servers. On order. - 7/5/2008 - Complete

Additional SAN storage to be added to the Banner server. Received and racked. - Complete

Additional memory to be added to domain controllers. Upgrades in progress. - 8/15/2008 - Complete

Footprints upgrade to version 8.11 - Clone a test system, install asset management and begin testing - 7/14/2008 - In production July 30th 2008 - Complete

Symantec Endpoint Server - Currently testing clients - Production Fall 2008. Complete.

Cbord System replacement - Upgrade begins on 6/30/2008 - 7/3/2008. Server received and racked. - Complete

DYKNOW software installed on lab servers -  Installed, LDAP issues with the software. - Complete.

Oracle Discover using OWB testing setup (Banner) - Working in test - TBA. - Complete.

Re-Build Anti-Spam Software/Hardware. Service will be down for a four hour period. - 6/19/2008 - Complete

Research, purchase, and install appropriate NAS device for video content servers. Storage target to contain one full semester of recorded video - Cancelled there will be two weeks of recorded material that is retained. - Cancelled.

Update Banner System to version 7.4. Banner will be unavailable from 6:00 am Sunday afternoon July 20th - Complete

Update Banner production System with required Luminus modules - August 25th, 2008 - Complete.

Add Second STL VM server to handle the increased software load. Hardware sized and purchased. Add additional memory to existing STL VM server to increase performance. 9/23/2008 - Complete

Remove Blackboard ver 6.0 and all of it's VM's. - Oct. 20th 2008 - 10/27/2008 Complete.

Modify the student account activation web page to include verbiage that strongly suggest the student change their default password and provide a link to the student password reset management page, along with information about what our requirements would be (8 character length, with the same complexity as the current faculty/staff policy. Complete.

 